mirror of
https://github.com/Kitware/CMake.git
synced 2026-04-23 14:48:19 -05:00
Help: Add .. versionadded directives to commands documentation
This change ony concerns directives that appear in the document body. The guidelines for inserting version directives: * Baseline version is CMake 3.0, i.e. directives start at 3.1. * Always use `.. versionadded::` directive, avoid ad-hoc version references. Exception: policy pages. * For new command signatures, put `versionadded` on a separate line after the signature. * For a group of new signatures in a new document section, a single version note at the beginning of the section is sufficient. * For new options, put `versionadded` on a separate line before option description. * If all the option descriptions in the list are short one-liners, it's fine to put `versionadded` on the same line as the description. * If multiple option descriptions in close proximity would have the same ..versionadded directive, consider adding a single directive after the list, mentioning all added options. * For compact value lists and sub-option lists, put a single `versionadded` directive after the list mentioning all additions. * When a change is described in a single paragraph, put `versionadded` into that paragraph. * When only part of the paragraph has changed, separate the changed part if it doesn't break the flow. Otherwise, write a follow-up clarification paragraph and apply version directive to that. * When multiple version directives are close by, order earlier additions before later additions. * Indent related lists and code blocks to include them in the scope of `versionadded` directive. Issue: #19715
This commit is contained in:
@@ -21,6 +21,7 @@ specify the type of project, id (``GUID``) of the project and the name of
|
||||
the target platform. This is useful for projects requiring values
|
||||
other than the default (e.g. WIX projects).
|
||||
|
||||
If the imported project has different configuration names than the
|
||||
current project, set the :prop_tgt:`MAP_IMPORTED_CONFIG_<CONFIG>`
|
||||
target property to specify the mapping.
|
||||
.. versionadded:: 3.9
|
||||
If the imported project has different configuration names than the
|
||||
current project, set the :prop_tgt:`MAP_IMPORTED_CONFIG_<CONFIG>`
|
||||
target property to specify the mapping.
|
||||
|
||||
Reference in New Issue
Block a user