Refactoring in commit 3882718872 (VS: Decouple solution generation from
`.sln` file format, 2025-09-15) accidentally left out automatic
detection of the external project type id from its file extension.
Since the `Visual Studio 18 2026` generator is new, we can switch
to the `.slnx` file format without changing behavior for users of
VS 2022 and older.
Fixes: #25887
For policy-specific tests, use the version before the policy was
introduced. Otherwise, use 3.5 where possible.
Also, remove `cmake_minimum_required()` and `project()` calls from
individual cases where they are handled by `CMakeLists.txt`.
In `cmGlobalVisualStudio7Generator::WriteTargetsToSolution`, we skip
writing `ZERO_CHECK.proj` to solution file as the check in
`cmGlobalVisualStudioGenerator::IsInSolution` returns `false` for
`ZERO_CHECK`. However, we write ZERO_CHECK to ProjectDependencies for
external projects as there are no checks in
`cmGlobalVisualStudio71Generator::WriteExternalProject`.
Similar to `cmGlobalVisualStudioGenerator::IsInSolution`, we introduce
`IsDepInSolution(const std::string&)` which excludes `ZERO_CHECK.proj`
from being added to sln file for the cases where we have `ZERO_CHECK.proj`.
Fixes: #23708
Add this generator *without* support for specifying the target
architecture in the generator name. cmake-gui will be taught
to provide a field for this, and command-line builds can use -A.
Also, teach this generator to select a default target architecture
based on the host architecture.
Fixes: #18689
Inspired-by: Egor Pugin <egor.pugin@gmail.com>
Set the minimum required version of CMake high enough to avoid the
warning for CMAKE_LEGACY_CYGWIN_WIN32. The warning appears on stderr
and breaks the expected output matching.
Ancient versions of CMake required else(), endif(), and similar block
termination commands to have arguments matching the command starting the
block. This is no longer the preferred style.
Run the following shell code:
for c in else endif endforeach endfunction endmacro endwhile; do
echo 's/\b'"$c"'\(\s*\)(.\+)/'"$c"'\1()/'
done >convert.sed &&
git ls-files -z -- bootstrap '*.cmake' '*.cmake.in' '*CMakeLists.txt' |
egrep -z -v '^(Utilities/cm|Source/kwsys/)' |
egrep -z -v 'Tests/CMakeTests/While-Endwhile-' |
xargs -0 sed -i -f convert.sed &&
rm convert.sed
Add "RunCMake.include_external_msproject" test to use the TYPE, GUID, and
PLATFORM options to include_external_msproject. Since projects with
custom types and platforms cannot be loaded without special VS plugins
validate the results by directly parsing the generated solution (.sln).
Co-Author: Leonid Yurchenko <nocturne@qarea.com>