mirror of
https://github.com/Kitware/CMake.git
synced 2026-02-24 08:38:39 -06:00
For policy-specific tests, use the version before the policy was introduced. Otherwise, use 3.10 where possible.
For policy-specific tests, use the version before the policy was introduced. Otherwise, use 3.10 where possible.