Files
CMake/Tests/RunCMake/include_external_msproject/CMakeLists.txt
T
Brad King d05a9bd1e6 Cygwin: Avoid legacy warnings in RunCMake.* tests
Set the minimum required version of CMake high enough to avoid the
warning for CMAKE_LEGACY_CYGWIN_WIN32.  The warning appears on stderr
and breaks the expected output matching.
2013-08-13 09:50:15 -04:00

4 lines
101 B
CMake

cmake_minimum_required(VERSION 2.8.4)
project(${RunCMake_TEST} NONE)
include(${RunCMake_TEST}.cmake)