mirror of
https://github.com/Kitware/CMake.git
synced 2026-01-21 14:10:41 -06:00
This change ony concerns directives that appear in the document body. The guidelines for inserting version directives: * Baseline version is CMake 3.0, i.e. directives start at 3.1. * Always use `.. versionadded::` directive, avoid ad-hoc version references. Exception: policy pages. * For new command signatures, put `versionadded` on a separate line after the signature. * For a group of new signatures in a new document section, a single version note at the beginning of the section is sufficient. * For new options, put `versionadded` on a separate line before option description. * If all the option descriptions in the list are short one-liners, it's fine to put `versionadded` on the same line as the description. * If multiple option descriptions in close proximity would have the same ..versionadded directive, consider adding a single directive after the list, mentioning all added options. * For compact value lists and sub-option lists, put a single `versionadded` directive after the list mentioning all additions. * When a change is described in a single paragraph, put `versionadded` into that paragraph. * When only part of the paragraph has changed, separate the changed part if it doesn't break the flow. Otherwise, write a follow-up clarification paragraph and apply version directive to that. * When multiple version directives are close by, order earlier additions before later additions. * Indent related lists and code blocks to include them in the scope of `versionadded` directive. Issue: #19715
28 lines
1.1 KiB
ReStructuredText
28 lines
1.1 KiB
ReStructuredText
include_external_msproject
|
|
--------------------------
|
|
|
|
Include an external Microsoft project file in a workspace.
|
|
|
|
.. code-block:: cmake
|
|
|
|
include_external_msproject(projectname location
|
|
[TYPE projectTypeGUID]
|
|
[GUID projectGUID]
|
|
[PLATFORM platformName]
|
|
dep1 dep2 ...)
|
|
|
|
Includes an external Microsoft project in the generated workspace
|
|
file. Currently does nothing on UNIX. This will create a target
|
|
named ``[projectname]``. This can be used in the :command:`add_dependencies`
|
|
command to make things depend on the external project.
|
|
|
|
``TYPE``, ``GUID`` and ``PLATFORM`` are optional parameters that allow one to
|
|
specify the type of project, id (``GUID``) of the project and the name of
|
|
the target platform. This is useful for projects requiring values
|
|
other than the default (e.g. WIX projects).
|
|
|
|
.. versionadded:: 3.9
|
|
If the imported project has different configuration names than the
|
|
current project, set the :prop_tgt:`MAP_IMPORTED_CONFIG_<CONFIG>`
|
|
target property to specify the mapping.
|